Addison Circle Park – Drainage Improvements
Status: Under Review
Description: Storm Drainage issues near Bowl Stage (Lawn area adjacent to the lower water basin on the east side of the park) causes ponding in the park and during heavy storm events water drains into the lower fountain basin. A drainage study is being prepared that will recommend short-term drainage improvements to the immediate area and longer-term solutions to the storm drain system in Festival Way.
Timeline: Design Phase – February 2026 through May 2026. Construction – TBD, will be coordinated around Special Events Dates.
Impact Notice: Impacts include earthwork, drain replacement and re-sodding. During this time, this section of the park may not be accessible.
Photos/Map: N/A
Contact: Janna Tidwell, Amber Davis
Last Updated: February 2026